How does NJNG keep noise and odors to a minimum during site improvements?
• During excavation, an odor-suppressing agent is used on the ground. The traffic plan for trucks entering and exiting the site is designed to maximize safety and minimize disruptions to neighborhoods by avoiding smaller side streets and scheduling in shifts. Trucks follow a plan approved by the municipality and avoid peak travel times to the extent possible. Air monitoring is used around the site to safeguard the area from the impact of the restoration.