How does the “Interlocking” system work?
Pavers are placed on one inch of bedding sand over a compacted aggregate base. The thickness of the base will vary depending on its application. Paving stones are retained using edge restraints. Commonly used edge restraints include concrete curbing, plastic edge restraints, aluminum edge restraints, and concrete slurry mixes. Once the pavers are placed and restrained the compaction process may begin. The pavers are compacted while fine masonry sand is swept into the joints. The compaction process may take 3 or 4 passes before full interlock is achieved. Upon completion of this compaction process, the area is ready for immediate use. Unlike asphalt and concrete, no curing or setting time is required for interlocking concrete paving stones.
Pavers are placed over a leveling course, which is over a compacted aggregate base. The thickness of the base will vary depending on the purpose of the application. The pavers are retained at the outside perimeter of the project using edge restraints. Edge restraints such as plastic edging and concrete curbs are recommended. Once the pavers are placed and restrained, the interlocking process may begin. Coarse, angular sand is swept into the joints and over the pavers. The pavers are compacted and may take 1 or 2 passes before the full interlock can be achieved. After compaction, the project is ready for use. Sweeping and cleaning of the area will be necessary.
– Pavers are placed over a leveling course, which is over a compacted aggregate base. The thickness of the base will vary depending on the purpose of the application. The pavers are retained at the outside perimeter of the project using edge restraints. Edge restraints such as plastic edging and concrete curbs are recommended. Once the pavers are placed and restrained, the interlocking process may begin. Coarse, angular sand is swept into the joints and over the pavers. The pavers are compacted and may take 1 or 2 passes before the full interlock can be achieved. After compaction, the project is ready for use. Sweeping and cleaning of the area will be necessary.