How long does manufacture & delivery take? Would it save money or time to manufacture components near the construction site?
In North America, Triodetic material can typically be expected on site 8 weeks after order & drawing approvals. International freight is subject to shipping schedules, but because the product components containerize very compactly, transport difficulties are rarely encountered. Unusual material finishes may be accelerated via pre-payments. Freight costs are a very small part of the overall cost & our delivery times are often a fraction of alternatives. Our design software & manufacturing equipment is closely linked & purpose-built to ensure product precision is consistently achieved. The result is assembly speed & structural integrity in service. Our operations comply with ISO quality procedures and therefore all materials are procured only from pre-approved suppliers who have demonstrated consistent conformance to our material tolerances & specifications. Local supply of cladding & glazing is contracted when advantageous.
Related Questions
- Is the delivery of moveable traffic barriers or temporary construction fencing, which will be removed from the site when the project is finished, subject to Prevailing Wage/Contractor Registration?
- If a site has been developed using WebSamhita components, does the end user need to download the WebSamhita components every time I visit the site?
- For what length of time are approved Site Plans or Construction Drawings valid?