How many people exit a SEPTA bus and then board an Ardmore train?
This is unknown at this time, but the number is believed to be nominal. SEPTA and Urban Engineers are performing pedestrian surveys to determine the amount of user interaction between bus and train. • Who are the engineer and architect for the garage? Urban Engineers is the lead and is ultimately responsible, with Tim Haahs & Associates and Converse Winkler Architecture as consulting engineers and architects. • What is the exterior of the Main Street parking garage going to look like? The “skin” of the garage will be developed once the final footprint is determined. It will have a brick look. The design will be compatible with the rest of the project and the surrounding architecture.