If polymer slurry is required by the Engineer, will it be required during the entire excavation operation and may the slurry be recycled?
The slurry must be introduced prior to beginning drilling in the uncased rock socket and remain in contact with the uncased rock socket throughout the remainder of the drilling process and until concrete is poured. The polymer slurry may not be recycled; a new batch will be required for each shaft.