Is there a public comment period for the Flood Protection Corridor Program (FPCP) draft guidelines?
Yes. The deadline for public comment on the draft Guidelines for the Flood Protection Corridor Program is April 30, 2007 at 5 p.m. Only written comments on the draft guidelines will be accepted, and comments may be submitted via email to floodsafe@water.ca.gov, or mailed to 3310 El Camino Avenue, Sacramento, California 95821, Attention: Flood Protection Corridor Program. • Will there be an application deadline for grants under the FPCP, or will applications be accepted on a “rolling” basis? According to the draft Guidelines for the Flood Protection Corridor Program, grant proposals will be solicited during discrete application periods. The time period for submitting applications shall be at least 30 days from the date notice is given by DWR that project proposals are being solicited. As long as uncommitted funds remain available to fund new projects, DWR shall solicit proposals at least once per calendar year. • How can I determine whether the project my agency is considering is eligib
Related Questions
- What is the time period over which a preliminary draft Airport Environment Strategy is required to be available for public comment?
- Is there a public comment period for the Flood Protection Corridor Program (FPCP) draft guidelines?
- Is there a public comment period for the Local Levee Grant Program draft guidelines?
Is there a public comment period for the Flood Protection Corridor Program (FPCP) draft guidelines?