What are the key points to successful placement of epoxy asphalt concrete pavement?
The key elements are maintaining temperature control of the Epoxy Asphalt concrete at the batch plant and completing roller compaction of the Epoxy Asphalt concrete before the Epoxy Asphalt on the deck has cooled too much. The breakdown rolling must be complete before the temperature drops below 82°C and the finish rolling before the temperature drops below 65°C.