What construction techniques will be employed to minimize the disturbance?
In addition, the project has been designed so that small areas of the bridge deck, about 10 feet long, will be saw cut lifted out each night and replaced with pre-cast concrete sections. This will greatly reduce noise and vibration from demolition activities and permit the contractor to install only the sections each night that are saw cut and lifted out.