If the base is up to 25mm (1″) out of level in any one plane, i.e. slopes up to 25mm (1″) front to back, but not side to side, or up to 25mm (1″) side to side, but not front to back, it may still be possible to build the unit. It would not be advisable to build if the design is outside these parameters, as the life and integrity of the building may be compromised.