What is considered a material modification? For example, if I have to make a change due to the lack of generation availability, is this considered a material modification?
A material modification is a change that has a material impact on the cost or timing of the Interconnection Request. A change to a generator or associated interconnection facilities will be assessed by our system engineers and they will determine whether or not the impact is a material modification.