What is meant when the safety rating field on the Level 1 (Public) Abstract or the Operator Record (Level 2 Abstract) is blank or not indicated?
Where no rating is indicated in the safety rating field, either the carrier is a new carrier and the 30-day period in which to dispute a proposed safety rating has not yet elapsed or there has been no event activity of any kind (accidents, convictions, inspections or other contact with the Ministry) on their record since December 4, 1994.
Related Questions
- Why were the Start and End Dates introduced for the Operator Record (Level 2 Abstract) and how can I make full use of them?
- Can the Registrar consider the record of a related operator during the assignment of a safety rating?
- What is the difference between a Level 1 (Public) Abstract and the Safety Rating Enquiry Searches?