What is the status of the review for my project?
Generally, when a report is received in the LUST Section, it will be reviewed in chronological order from the date it was received. The response time can vary due to a project manager’s workload. The review time can also be extended if additional technical review (geology, chemistry, risk, etc.) is sought. The turnaround time for technical reviews can be up 60 days or more. If the site is assigned call the IDEM Project Manager. If it is unassigned, call (317) 232-8900 or toll free at (800) 451-6027, Ext. 28900.