What is the typical lead time for active metal brazing?
Lead times depend on several factors, such as material lead times and amount of fixturing and/or tooling required. If the customer supplies the material, the lead time is often 1-2 weeks. If INTA Technologies supplies the materials, it will likely add three weeks to the lead time. Tooling and fixtures for proper hermetic brazing are often required.