Why do I need to complete a Preliminary Stormwater Proposal?
Development Standards – Chapter 2 Stormwater Management requires as a minimum that a Preliminary Stormwater Proposal be submitted. The Proposal is intended to provide the County with a general overview as related to a proposed project. The information will be used to determine which regulations apply and whether to require a more detailed Stormwater Design Report.