Why do you recommend I wait 7 –28 days to use my new WarmWire system after the thinset, tile and grout are installed?
This is based on the recommendation of thinset and grout manufacturers. Their products require a curing period before the masonry reaches its full strength. This process cannot be rushed by heating and apparently, the process can be adversely affected by the modest temperatures of the heating wires if they are turned on before 7 – 28 days (according to the thinset and grout manufacturers).