The points at which utilities connect to the building should be identified prior to the pour. This will allow for conduits to be placed through the wall so that the utility can enter. Once the concrete is poured and cured, channels or grooves are cut directly into the form using and electric hot knife or router. Plumbing and electrical lines are then inserted into the grooves and covered by drywall.
The points at which utilities connect to the building should be identified prior to the pour. This will allow for conduits to be placed through the wall so that the utility can enter. Once the concrete is poured and cured, channels or grooves are cut directly into the form using an electric hot knife or router. Plumbing and electrical lines are then inserted into the grooves and covered by drywall.
Related Questions
- I installed Cesview IIi version 1.2.0 and now I have Cesview IIi Utilities on my Start/Programs menu; what is this?
- How do I create a test that requires running existing Linux utilities that are not currently installed?
- Can disk utilities like Scandisk and Defragmenter be run while RecoveryMagic is installed?