How much are the Domestic Wastewater Collection / Transmission System Construction (Sewer Extension) Permit fees?
There are two fees (FDEP & DERM) that need to be paid for this permit by means of two separate checks. Both checks should be made payable to Miami Dade County. FDEP: the construction fee for the collection/transmission system is based on the number effective dwelling units (EDU) or average daily flow. DERM: The construction fee for a land based collection/transmission system is based on the length in feet of gravity and force main piping installed. There is an additional fee when the project includes a sewer lift station. For a marina based collection/transmission system the fee is bases in the number of slips constructed. Please see DERM Fee Schedule.
Related Questions
- How long does it take to process the Domestic Wastewater Collection / Transmission System Construction (Sewer Extension) Permit?
- How long is the Domestic Wastewater Collection / Transmission System Construction (Sewer Extension) Permit valid?
- What is the Domestic Wastewater Collection / Transmission System Construction (Sewer Extension) Permit used for?