What is the advantage of a SCADA design team with integration experience?
In any project, it is critical that the requirements included in a specification can be met. Too often, specifications are written based on desires that are un-attainable or require excessive costs in order to accomplish. In some cases, specifications are developed that offer change order loopholes. Some bidders estimate projects and anticipate change order costs in order to reduce the formal price. Design teams with direct integration experience know what can and can not be done. Ideally, as each requirement in a project is identified, a possible technique will be understood by the design engineer in order to assure the requirement may be satisfied. He/she should also recognize the effort required to satisfy the requirement and can provide this information to the owner. The owner may decide the cost outweighs the benefit. Traditionally, a cost estimate is provided with a project specification. Again, a design team with integration experience will be able to offer an estimate that is b